Tunneling Under the Alps
Extreme Engineering · Season 1 · Episode 6
A tunnel over 35 miles long is to be dug under the Swiss Alps to redirect Europe's traffic. This $7 billion project will take 6 years to complete with man and machine fighting the mountains 24/7.
Episode Details
Air date, runtime, timezone, and episode position.
Season
1
Episode
6
Air Date
07/May/2003
Air Time
—
Runtime
—
Overview
Episode summary.
A tunnel over 35 miles long is to be dug under the Swiss Alps to redirect Europe's traffic. This $7 billion project will take 6 years to complete with man and machine fighting the mountains 24/7.
Episode Navigation
Move between previous and next episodes.