London's Olympic Aquatic Stadium
Extreme Engineering · Season 9 · Episode 4
The London Aquatics Centre will host 44 swimming & diving events during the 2012 Olympics and live on as a new addition to the London landscape. Danny Forster goes with crews as they construct one of the most advanced swimming facilities ever built.
Episode Details
Air date, runtime, timezone, and episode position.
Season
9
Episode
4
Air Date
29/Apr/2011
Air Time
—
Runtime
—
Overview
Episode summary.
The London Aquatics Centre will host 44 swimming & diving events during the 2012 Olympics and live on as a new addition to the London landscape. Danny Forster goes with crews as they construct one of the most advanced swimming facilities ever built.
Episode Navigation
Move between previous and next episodes.